Clarksville Founded by freedman Charles Clark (who changed his name from Charles Griffin. Acts 2009, 81st Leg., R.S., Ch. ''Streilitz was the family name of Queen Charlotte . Detailed analysis of your businesss online presence, including Google and all social media platforms. 232.152. (c) A requirement that was established by or adopted under Chapter 436, Acts of the 55th Legislature, Regular Session, 1957 (Article 6626a, Vernon's Texas Civil Statutes), or Chapter 151, Acts of the 52nd Legislature, Regular Session, 1951 (Article 2372k, Vernon's Texas Civil Statutes), before September 1, 1983, and that, after that date, continues to apply to a subdivision of land is enforceable under Subsection (a). (2) each owner or utility whose rights may be interfered with has agreed to the cancellation and reestablishment. Aug 29, 2016 - Explore LD's board "subdivision signs" on Pinterest. Sec. Terra Bella. 232.002. With many office staff working remotely, the DRE simply doesnt have time to tweak its system to address variances. (c) A document filed under Subsection (b) is a public record. (g) This section does not increase or expand, and shall not be interpreted to increase or expand, the authority of a county to regulate plats or subdivisions under this chapter. Amended by Acts 1989, 71st Leg., ch. 404, Sec. Added by Acts 1999, 76th Leg., ch. A subdivider or agent of a subdivider may not transfer a lot through an executory contract or other similar conveyance to evade the requirements of this subchapter. (6) road access to a plat or subdivision in an adjoining county. June 19, 2009. (a) This subchapter applies only to: (1) a county any part of which is located within 50 miles of an international border; or. 8, eff. 232.0021. In this article, well be breaking down everything you need to know about subdivision names and how you can find a name for your community that really delivers. (D) the amendment does not have a material adverse effect on the property rights of the other owners of the property that is the subject of the plat. (c) During the pendency of any enforcement action brought, any resident of the affected subdivision, or the attorney general, district attorney, or county attorney on behalf of a resident, may file a motion against the provider of utilities to halt termination of pre-existing utility services. 16, eff. (2) is connected by the part of the roadway or easement to be canceled or closed, by the most direct feasible route, to: (A) the nearest remaining public highway, county road, or access road to the public highway or county road; or. 3), Sec. REASONS FOR DISAPPROVAL OF PLAT REQUIRED. 9, eff. DEVELOPER PARTICIPATION CONTRACTS. (B) on or before January 1, 2001, owned and occupied the residential dwelling; (2) the utility previously provided the utility service on or before January 1, 2001, to the property for the person requesting the service; (3) the utility service provided as described by Subdivision (2) was terminated not earlier than five years before the date on which the person requesting utility service submits an application for that service; and. Nationwide distribution and product delivery. CONNECTION OF UTILITIES. September 1, 2007. 232.001. The AcreValue Montgomery County, TX plat map, sourced from the Montgomery County, TX tax assessor, indicates the property boundaries for each parcel of land, with information about the landowner, the parcel number, and the total acres. (5) describe the restrictions, conditions, and limitations on the use of the property that the receiver has determined are appropriate, other than the restrictions, conditions, and limitations provided by other law. Acts 2007, 80th Leg., R.S., Ch. 12, eff. 1093), Sec. In Louisiana, Southern charm comes alive in the eight different areas of the state with Bayou in the name. 346 (S.B. Added by Acts 2007, 80th Leg., R.S., Ch. 708 (S.B. Acts 2019, 86th Leg., R.S., Ch. 232.0083. Acts 1987, 70th Leg., ch. SUBCHAPTER E. INFRASTRUCTURE PLANNING PROVISIONS IN CERTAIN URBAN COUNTIES. Today, the world has several divisions that further break down the entire world into communal regions that get divided further into smaller clusters of housing; one such being Subdivisions. Sec. (b) The commissioners court may not grant an extension under Subsection (a) if it would allow an occupied residence to be without water or sewer services. INCITS 446-2008 includes many more entity records than those for which the Census Bureau tabulates data. Coleman, Osce Goodwin, George W. Works and J. Houston Miller, whose names you might recognize for the Vickery Place streets that still bear their names. 3834), Sec. (2) the reasons in writing and any documentation that support a variance granted under Section 232.042. 232.008. 232.102. (5) reasonable specifications for streets or roads in the manufactured rental home community to provide ingress and egress access for fire and emergency vehicles. (e) The failure of the attorney general to comment or object to a delay or variance granted under this section does not constitute a waiver of or consent to the validity of the delay or variance granted. (g) After the receiver has improved the platted lot to the degree that the lot is developable and meets all applicable standards, or before petitioning the court for termination of the receivership, the receiver shall file with the court: (1) a summary and accounting of all costs and expenses incurred, which may, at the receiver's discretion, include a receivership fee of up to 15 percent of the costs and expenses incurred, unless the court, for good cause shown, authorizes a different limit; (2) a statement describing the disposition of each lot, including whether the lot was aggregated with other lots; (3) a statement of all revenues collected by the receiver in connection with the use or disposition of the lots; and. Added by Acts 1995, 74th Leg., ch. (3) subdivided by a plat approved before September 1, 1989. Most recently, we had a large file rejected by the DRE because the advertising name in our application for the Final (White) Report did not match the advertising name provided in the Preliminary (Pink) Report. Project management services include task assignment, scope confirmation, progress monitoring, and single invoicing. June 16, 1995. Cashier's checks, Business checks, or Money orders are acceptable made payable to " El Paso County Clerk, County of El Paso, El Paso County, or County Clerk (s)." For any general questions, please e-mail: Recording@epcounty.com. 708 (S.B. (e) The commissioners court may impose a fee for filing an application under this section. (C) a statement signed by an engineer licensed in this state certifying that the plans for the water and sewer facilities meet the minimum state standards; (4) the commissioners court finds that the unplatted subdivision at the time the delay or variance is requested is developed in a manner and to an extent that compliance with specific platting requirements is impractical or contrary to the health or safety of the residents of the subdivision; and. Added by Acts 1995, 74th Leg., ch. Whether youre looking for a house cleaning or starting a major renovation, Porch is your destination for all things home. 377, Sec. (2) require a right-of-way on a street or road that functions as a major thoroughfare of a width of more than 120 feet, if such requirement is consistent with a transportation plan adopted by the metropolitan planning organization of the region. Sept. 1, 1997. 345, Sec. Of course, sometimes a name just happens to become popular in any given state. (a) This section applies only to real property located outside municipalities and outside the extraterritorial jurisdiction, as determined under Chapter 42, of municipalities with a population of 1.5 million or more. We pulled data from the U.S. census for all Census Designated Places (CDPs) in the United States. Over the weekend, I went to a birthday party for a smart and fun 13-year-old in my extended family, with three other kids and three other grownups. Its not hard to imagine why Beach shows up in the neighborhood titles of 66 different Florida areas. With the introduction of clustered civilizations, humankind progressed, one step at a time to create a stable socio-economic land to live in where people live together to aid each other in need. (d) The commissioners court may not adopt minimum infrastructure standards that are more stringent than requirements adopted by the commissioners court for subdivisions. 6, eff. All net proceeds from the disposition of a lot by the receiver shall be placed in trust and remain in trust for at least three years, unless claimed before the expiration of the trust period. A POTENTIAL BUYER WHO WOULD LIKE MORE INFORMATION SHOULD MAKE ADDITIONAL INQUIRIES OR CONSULT WITH PRIVATE COUNSEL.". A requirement adopted under this subsection must provide for an exemption from the requirement if the owner of the tract submits with the plat application an acknowledged statement indicating that the digital mapping technology necessary to submit a map that complies with this subsection was not reasonably accessible. (5) make a reasonable effort to have electric utility service and gas utility service installed by a utility. Acts 2013, 83rd Leg., R.S., Ch. [3] An incomplete list is provided below:[4], See: List of colleges and universities in Houston. In some places, the opposite effect occurred. 2253), Sec. (b) The bond must be conditioned on the construction or installation of water and sewer service facilities that will be in compliance with the model rules adopted under Section 16.343, Water Code. There are over 100 Lake Conroe subdivisions along the lake's shores, and they cover four cities Conroe, Montgomery, Willis, and Huntsville. If the planning commission refuses to approve a plat, the planning commission shall provide to the person requesting approval a notice specifying the reason for the disapproval. Save up to 50% off MSRP and FREE shipping. Sec. Added by Acts 1989, 71st Leg., ch. Added by Acts 1995, 74th Leg., ch. BOND REQUIREMENTS. (c) The request made under Subsection (b) must adequately identify the land that is the subject of the request. 1, eff. Sec. Aug. 28, 1989; Acts 1999, 76th Leg., ch. Sec. Mark your calendar! Sec. 232.005. (3) provide a certified letter from each utility provider stating that it has the right to serve the area and it will serve the area. Acts 2009, 81st Leg., R.S., Ch. Sept. 1, 1987. September 1, 2019. Added by Acts 2007, 80th Leg., R.S., Ch. Sept. 1, 1987. An application submitted to the planning commission that contains the documents and other information on the list is considered complete. Sept. 1, 1999. The commissioners court shall refuse to approve a plat if it does not meet the requirements prescribed by or under this subchapter or if any bond required under this subchapter is not filed with the county clerk. 1, eff. (b) A plat required under this section must: (1) be certified by a surveyor or engineer registered to practice in this state; (2) define the subdivision by metes and bounds; (3) locate the subdivision with respect to an original corner of the original survey of which it is a part; (4) describe each lot, number each lot in progression, and give the dimensions of each lot; (5) state the dimensions of and accurately describe each lot, street, alley, square, park, or other part of the tract intended to be dedicated to public use or for the use of purchasers or owners of lots fronting on or adjacent to the street, alley, square, park, or other part; (6) include or have attached a document containing a description in English and Spanish of the water and sewer facilities and roadways and easements dedicated for the provision of water and sewer facilities that will be constructed or installed to service the subdivision and a statement specifying the date by which the facilities will be fully operable; (7) have attached a document prepared by an engineer registered to practice in this state certifying that the water and sewer service facilities proposed under Subdivision (6) are in compliance with the model rules adopted under Section 16.343, Water Code, and a certified estimate of the cost to install water and sewer service facilities; (8) provide for drainage in the subdivision to: (A) avoid concentration of storm drainage water from each lot to adjacent lots; (B) provide positive drainage away from all buildings; and. ALL INFORMATION 1 IS REQUIRED TO BE PROVIDED UNLESS INDICATED AS OPTIONAL Failure to provide required information may result in rejection of application.